We follow a structured, phase-wise workflow that simplifies decision-making, strengthens compliance, and accelerates execution. Each stage is thoughtfully designed to reduce risk, control costs, and deliver predictable outcomes — ensuring your hospital project progresses smoothly from concept to commissioning.

14+
Years Experience
years of combined project experience
0 +
healthcare infrastructure projects supported
0 +
approval success rate
0 %
How it works

Our Step-by-Step Method for Successful Hospital Development

Step 1

Project Initiation (Week 0–2)

We validate the project’s viability through site and budget assessments.


Project brief, shortlist report, preliminary costing.

Step 2

Feasibility & Financial Packaging (Week 2–4)

We prepare the documents required for bank loan processing.

Feasibility Report, Bank Proposal Packet.

Step 3

Statutory Approvals & Pre-Design (Week 4–10)

We initiate all necessary approvals early to avoid delays later.

Permit applications, pre-design layouts, compliance checklist.

Step 4

Detailed Design & 3D Modelling (Week 8–16)

Design is prepared with accuracy using BIM coordination.

Working drawings, coordinated Revit model, BOQ.

Step 5

Pre-Construction & Tendering (Week 14–18)

We help select the right contractor with transparent pricing.

Tender documents, bid analysis, signed contracts, baseline schedule.

Step 6

Construction & Project Management (Week 18–Variable)

We manage site execution with quality and safety controls.

Progress reports, QA/QC records, updated timelines.

Step 7

Commissioning, Testing & Handover

We ensure your hospital is operationally ready.

As-built drawings, O&M manuals, statutory certificates, training records, occupancy support.